Getting Solar Approved in a California HOA: Step-by-Step Guide for Temecula Homeowners
Helping Riverside County homeowners navigate SCE rates and solar options since 2020
If you live in Morgan Hill, Wolf Creek, Harveston, Paloma del Sol, or any of Temecula's other master-planned communities, you have an extra step between signing a solar contract and flipping the switch: HOA approval. California law is firmly on your side, but knowing the process, submitting a complete application the first time, and understanding what your HOA can and cannot legally require are what separate a 30-day approval from a months-long dispute.
The California Solar Rights Act: Civil Code 714 and 714.1
California's foundational solar protection lives in two adjacent code sections. Civil Code Section 714 establishes that any covenant, restriction, or condition in a deed, CC&Rs, or other governing document that effectively prohibits or unreasonably restricts the installation or use of a solar energy system is void and unenforceable. Section 714.1 extends the same protection specifically to common interest developments, the legal category that covers HOA-governed communities.
These protections existed in earlier forms going back to California Senate Bill 49 in 2014. Assembly Bill 2188, signed into law in 2022 and effective January 1, 2023, significantly strengthened both sections. AB 2188 shortened the HOA review window, tightened the definition of what counts as an unreasonable restriction, and clarified that HOA approval cannot be withheld simply because an application is pending or because the HOA board is slow to schedule its architectural committee.
The result is a legal framework that is specific, enforceable, and unambiguous in its core principle: your HOA cannot block solar. What your HOA can do is regulate how your installation looks and where panels are placed, within narrow statutory limits. Understanding those limits is what this guide covers.
What HOAs Cannot Legally Do
Before covering the application process, it helps to understand the legal floor your HOA must operate above. The following restrictions are void and unenforceable under California law regardless of what your CC&Rs say.
- Flat prohibition on solar. If your CC&Rs include language that says solar panels are not permitted, that provision is void under Civil Code Section 714. It does not matter when the CC&Rs were written or whether the HOA voted to include that language. State law supersedes it.
- Requiring conditions that add more than $1,000 to your project cost. The statutory threshold is $1,000 above what a standard installation would cost. If an HOA requires custom racking, specific panel colors at premium pricing, or any other specification that pushes costs above that threshold, the conditions that cause the overage are void.
- Requiring placement that reduces system output by more than 10 percent. An HOA can say "put the panels on the rear roof slope instead of the street-facing slope" only if that placement still delivers at least 90 percent of what the optimal layout would produce. If the rear slope is heavily shaded and output drops 25 percent, the HOA's placement requirement is unenforceable.
- Refusing to respond within 45 days. The statutory review period under AB 2188 is 45 days from receipt of a complete application. An HOA that simply does not respond within that window has, by operation of law, approved the application. Silence is not a veto.
- Requiring insurance above your existing homeowner's policy. Your HOA cannot demand that you obtain a specialized solar installation insurance policy as a condition of approval. If your standard homeowner's policy covers the system, that satisfies the HOA's legitimate interest in liability coverage.
- Demanding permits beyond what law requires. An HOA cannot require you to obtain additional permits, inspections, or certifications beyond those already required by the City of Temecula, Riverside County, or Southern California Edison.
- Requiring removal of an existing approved installation. Once your system has been approved and installed, an HOA cannot later require removal based on updated aesthetic guidelines or new board preferences.
What HOAs Can Legally Require
The Solar Rights Act preserves HOA authority to impose reasonable restrictions that do not push cost above the $1,000 threshold and do not reduce output beyond 10 percent. In practice, the following conditions are legally defensible and commonly seen in Temecula-area HOA approvals.
- Pre-approval before installation. Every HOA-governed community can require you to submit an application and receive written approval before your installer begins work. Skipping this step is a CC&R violation even if state law would have required the HOA to approve you. The sequence matters: get the approval, then schedule the install.
- Panel placement on non-street-facing roof sections. If your home has adequate rear or side roof area that can support a system within 10 percent of the optimal output, the HOA can require panels be placed there. Many Temecula tract homes have large south- or west-facing rear roof sections that satisfy both the HOA's aesthetic preference and the technical requirements for a productive system.
- Color-matched visible hardware. Racking rails, conduit, junction boxes, and wire management covers that are visible from the street or common areas can be required to match the home's roof or exterior color. The additional cost of specified colors is usually under the $1,000 statutory threshold.
- Flush mounting. Some HOA architectural guidelines specify that panels must lie flush with the roofline rather than elevated on tilt mounts. Flush mounting slightly reduces airflow under the panels, which can have a minor effect on operating temperature and efficiency, but generally does not approach the 10 percent output reduction threshold.
- Screening or landscaping that does not block panels. An HOA can require screening of ground-level equipment such as inverters or battery storage enclosures using landscaping or decorative fencing, as long as the screening does not shade the panels themselves.
- Specific documentation in the application. HOAs can require detailed application packages including manufacturer spec sheets, site plans, installer credentials, and conduit routing diagrams. Submitting a thorough package from the start is both legally compliant and strategically smart.
The HOA Approval Process Step by Step
The exact process varies slightly by community, but the structure is consistent across Temecula-area HOAs. Here is the standard sequence from contract signing to approval in hand.
Step 1: Get the current CC&Rs and architectural guidelines
Request the current version of your HOA's CC&Rs and architectural review guidelines before you do anything else. The version that matters is the most recently adopted one, not the original recorded document. HOAs amend CC&Rs periodically, and architectural guidelines are often separate documents that get updated more frequently than the core CC&Rs. Many Temecula HOAs post current documents on their community website or through a management company portal. If you cannot find them online, submit a written request to the management company.
Step 2: Ask your neighbors who have installed solar
If you see solar panels on a neighbor's roof in your community, knock on the door or send a note. Ask what the HOA required, how long the review took, and whether they ran into any objections. Actual approval histories from within your specific community are more useful than general information about California HOA law. Some HOAs will also share examples of approved applications if you request them through the management company.
Step 3: Have your installer prepare design drawings
Most HOAs require professional-grade drawings, not hand sketches. Your solar installer should produce a site plan showing your home's footprint and roof layout, the proposed panel placement with approximate dimensions, the conduit routing from the panels to the inverter and utility meter, and any exterior equipment locations such as inverters or battery enclosures. The drawings should also identify the roof material, pitch, and any obstructions such as chimneys or vents. Some HOAs also require a rendering or photo simulation showing what the installed system will look like.
Step 4: Assemble your application package
A complete application package for most Temecula-area HOAs includes the items below. Submitting everything at once starts the 45-day clock and prevents the HOA from restarting the clock by claiming the application was incomplete.
- Completed HOA architectural review application form (available from the management company)
- Cover letter citing California Civil Code Section 714 and acknowledging the HOA's authority to impose reasonable conditions
- Site plan and roof layout drawing with panel placement
- Conduit and wiring routing diagram for any exterior-visible components
- Manufacturer specification sheets for the solar panels (including dimensions, color, and output ratings)
- Manufacturer specification sheets for the inverter
- Color samples or photos of racking, conduit, and hardware
- Your installer's California Contractors State License Board (CSLB) license number
- Installer's certificate of liability insurance
- Expected annual energy output of the system
- Proposed installation start date
Step 5: Submit and document the submission date
The 45-day statutory review window begins on the date the HOA receives a complete application. Submit via a method that creates a record: certified mail with return receipt, email to the management company with a read receipt request, or hand delivery with a date-stamped copy for your records. Do not rely on dropping a package in the HOA management company's drop box with no documentation of receipt.
Step 6: Respond to any requests for additional information
If the HOA's architectural committee requests additional information or clarification during the review period, respond promptly. A request for additional information does not restart the 45-day clock in most interpretations of the statute, but the more cooperative and responsive you are during the review, the smoother the outcome tends to be. If the HOA requests something that appears to go beyond what the law allows, note the request in writing and respond by providing what you reasonably can while reserving your right to object to unlawful conditions.
Step 7: Receive written approval
Approval should come in writing from the architectural committee or the HOA board. Keep a copy of the approval letter with your permit and installation documentation. Your installer will need a copy to proceed with the city or county permit application. If the HOA imposes conditions as part of approval, review each condition against the statutory limits before accepting.
How to Write a Cover Letter That Signals You Know the Law
The cover letter is the most underrated part of a solar HOA application. Most homeowners skip it entirely and submit only the technical documents. A well-written cover letter accomplishes three things: it establishes the legal framework governing the HOA's review, it demonstrates that you understand the HOA's legitimate interests, and it puts the committee on notice that you are aware of your rights.
Your cover letter should open by identifying yourself, your property address, and the nature of the application. The second paragraph should reference California Civil Code Section 714 and Civil Code Section 714.1 by name and state that you understand the HOA has the authority to impose reasonable conditions within the statutory limits. Do not use this paragraph to threaten the HOA or to suggest you will take legal action if denied. Save that for later if needed. The tone should be cooperative.
The third section of the letter should walk through each of the HOA's documented solar guidelines from the architectural review documents and explain, point by point, how your application addresses each one. If the guidelines require rear-facing placement, confirm that your design uses rear-facing placement. If they require color-matched racking, confirm the specific product and color you have specified. If the guidelines are silent on solar, note that and reference the statutory framework that governs in the absence of specific community guidelines.
Close the letter by noting the submission date, acknowledging the 45-day review window, and providing a single point of contact at your installer for any technical questions the committee may have. Sign it yourself, not just from your installer.
Common HOA Objections and California Law Rebuttals
HOA architectural committees in Temecula-area communities raise the same objections repeatedly. Here is how each objection stands up against California law.
"Panels are visible from the street." Visibility from the street is not, by itself, grounds for denial. The statute permits the HOA to require placement on non-street-facing surfaces only when that placement does not reduce output by more than 10 percent. If south- or west-facing roof sections happen to face the street and represent the best placement for your system, and if rear-facing placement would reduce output beyond the 10 percent threshold, the HOA cannot require rear placement. Your installer can document this with a shading analysis.
"Solar panels reduce property values." This objection is factually unsupported. A widely cited Lawrence Berkeley National Laboratory study found that solar panels increase home sale prices by an average of roughly $15,000, with higher values in markets with strong solar awareness. California communities with high solar penetration, including many in Riverside County, have seen home values rise alongside solar adoption rates. If an HOA raises this objection in writing, point to the research and note that the objection does not constitute a lawful basis for denial under Civil Code Section 714.
"Our CC&Rs prohibit solar." Any CC&R provision that prohibits solar is void under state law. This is not a gray area. You do not need to wait for an HOA vote to change the CC&Rs before proceeding with your solar application. The provision is void as written. Cite Civil Code Section 714 in your response.
"You need to get a variance first." Some HOAs frame the solar application as a variance request under their architectural guidelines, which can trigger additional approval steps, fees, or meetings. This framing is problematic if it adds cost beyond the $1,000 threshold or extends the timeline in a way that effectively prevents approval within 45 days. California law does not require solar applicants to obtain variances; it requires them to submit an application and receive approval within 45 days.
"We need to see proof of structural engineering." If the HOA requires a structural engineering report as a condition of approval, this is worth evaluating case by case. For standard rooftop residential installations on asphalt shingle roofs within normal weight limits, structural reports are generally not required by the city permit process and may add cost that pushes against the $1,000 threshold. For tile roofs or unusual configurations, structural review may legitimately be required both by the permit process and, derivatively, by the HOA. Your installer should be able to identify when a structural report is a reasonable requirement versus a delay tactic.
Temecula HOA Landscape: The Communities You Need to Know
Temecula has a higher concentration of master-planned community HOAs than most of Riverside County. If you are buying or already own in any of the following communities, HOA approval is part of your solar process.
Morgan Hill is one of Temecula's largest and most active HOA communities. The Morgan Hill HOA requires architectural committee pre-approval for solar and has established processes for reviewing applications. Installers who have previously worked in Morgan Hill know what the committee prefers. Rear and side placement is generally required where technically feasible.
Wolf Creek has an active HOA with documented architectural guidelines that address solar. Multiple homeowners have installed solar in Wolf Creek, and the community's approval history suggests a reasonably functional process when applications are submitted completely.
Harveston is a master-planned community in northern Temecula with a community association that requires pre-approval. Harveston's streets include some with east-west orientation that makes south-facing rear placement the natural and HOA-preferred configuration for most homes.
Redhawk includes single-family homes and townhomes with separate HOAs depending on the specific neighborhood within the development. Confirming which HOA governs your specific address before submitting an application matters in Redhawk.
Paloma del Sol has active HOA governance with architectural review requirements. The community includes a range of home sizes and roof configurations, and solar installations are common throughout the development.
Crowne Hill is an upscale community with a strong HOA that takes aesthetic guidelines seriously. Crowne Hill applicants benefit from thorough applications with professional-grade drawings and explicit responses to each point in the community's architectural guidelines.
Beyond these six, additional HOAs govern neighborhoods in Vail Ranch, Paseo del Sol, Temeku Hills, and several smaller planned developments throughout the city. Before assuming you have no HOA, check your title documentation or call the Riverside County Assessor's office with your parcel number.
What to Do If Your HOA Denies Your Application
A denial is not the end of the process. California law provides a structured path for contesting an unlawful HOA denial, and most HOA boards reverse unlawful denials quickly once they receive a written notice that cites the specific statute.
Step 1: Get the denial in writing. If the HOA denies your application verbally, in a meeting, or through a management company phone call, request a written denial letter that states the specific reasons for the denial. Do not proceed without it. The written denial is your evidence if you need to escalate.
Step 2: Evaluate the stated reasons. Read the denial reasons against Civil Code Section 714. If the HOA cites a blanket prohibition, claims the panels are not permitted under CC&Rs without further analysis, or imposes conditions that clearly exceed the statutory limits, you have a strong legal basis for challenging the denial.
Step 3: Send a certified letter citing the statute. Draft a letter to the HOA board and management company that states, clearly and without hostility, that the denial is void under California Civil Code Section 714. Quote the relevant language from the statute. Note the date your application was submitted and the 45-day window. State that you intend to proceed with the application and that you are requesting the HOA engage in the internal dispute resolution process required by California Civil Code Section 5900.
Step 4: Use the internal dispute resolution process. California Civil Code Section 5900 requires HOAs to offer a "meet and confer" internal dispute resolution process before a homeowner can initiate legal action. Request this process in writing. Many disputes resolve at this stage when the HOA board and its management company recognize the legal exposure of continuing to deny a Solar Rights Act application.
Step 5: Consult an attorney if needed. If the HOA continues to deny after written notice and internal dispute resolution, California Civil Code Section 714 allows a homeowner to seek injunctive relief and recover attorney's fees from a homeowners association that improperly prohibits or restricts a solar installation. The fee-shifting provision is meaningful because it means HOAs bear real legal cost for unlawful denials. Most HOA attorneys advise their clients to approve compliant solar applications rather than litigate.
Condos and Townhomes: Different Rules Apply
The Solar Rights Act protections described above apply to homeowners who own the roof surface where solar would be installed. In most single-family HOA communities, that is you. In condominium buildings and many townhome communities, the situation is more complicated.
In a condominium, individual unit owners typically own the interior airspace of their unit. The roof, exterior walls, and structural elements are generally common area owned collectively by the HOA. Installing solar on a roof you do not own requires the HOA's cooperation in a fundamentally different way than getting approval for a roof you own. Civil Code Section 714.1 addresses this by allowing individual condo owners to install solar on "exclusive use common area" such as a private patio or balcony, and by creating a pathway for HOA-level community solar programs.
For most high-rise and mid-rise condo units, rooftop solar is not individually feasible. Ground-floor or garden-level units with private patios may be able to install ground-mount or patio-mount systems on exclusive-use common area, but the system size will be limited by the available space. If you live in a condo and want solar, the most realistic path is a community solar subscription through SCE's Virtual Net Energy Metering program, which allows multiple unit owners to share the output of a shared solar system, typically installed on the building's roof by the HOA collectively.
Townhomes with individual roof ownership are different. If your townhome title includes ownership of the roof above your unit, the standard Solar Rights Act protections apply, and the process is essentially identical to a single-family home. Confirm your ownership status with your title documents before assuming either path.
Ground Mount Systems in HOA Neighborhoods
Some homeowners with rooftop limitations, whether from shading, roof condition, or limited roof space, consider ground-mounted solar systems installed in a backyard or side yard. Ground-mount systems often produce more power per panel because they can be optimally tilted and oriented without being constrained by roof pitch and azimuth.
The challenge in HOA communities is that CC&Rs frequently prohibit structures in front yards and side yards, and some explicitly restrict structures in rear yards beyond certain dimensions or heights. The Solar Rights Act's protections extend to solar installations on "the roof or awning" and on "exclusive use common area," but the statutory language has historically been interpreted more narrowly for ground-mount systems on private lots within HOA-governed communities than for rooftop systems.
If you want a ground-mount system in a Temecula HOA community, the analysis comes down to your specific CC&Rs and architectural guidelines. If the CC&Rs prohibit structures above a certain height in the rear yard, a ground-mount solar array on adjustable racking may fall within that prohibition, and the Solar Rights Act may not provide a complete override. Review the specific language with your installer and, if needed, with an attorney before investing in a ground-mount design.
In practice, the backyard placement exception for low-profile ground-mount systems, meaning systems mounted close to the ground with minimal elevation, has been approved by many HOA architectural committees in Temecula and Murrieta when the design keeps the array below fence height and not visible from the street. These approvals are fact-specific and depend on the committee's interpretation of "reasonable restrictions."
Documents to Gather Before You Apply
Starting the application process before your installer has design drawings ready is a mistake that adds weeks to your timeline. The right sequence is to gather your HOA documents first, share them with your installer at contract signing, and request that HOA-ready drawings be prepared as part of the standard design package.
Here are the documents to gather before your installer begins the design phase:
- Current CC&Rs. Not the original recorded document, but the most recently amended version. If you do not have a copy, request it from the management company. Most California HOAs are required to provide this to homeowners on request within a reasonable timeframe.
- Architectural Review Guidelines or Design Standards. This is often a separate document from the CC&Rs. It typically contains more specific guidance on what the architectural committee reviews and what standards apply to improvements. Many HOAs that have dealt with solar applications have added a specific solar section to these guidelines.
- Architectural Review Application Form. The management company can provide the blank form. Having it before your installer starts the design allows your installer to format drawings to match what the form requires.
- Examples of approved solar applications from neighbors. Not every HOA will share these, but many management companies will provide anonymized examples. An approved application from your block or your HOA is the best guide to what the committee actually approves.
- Management company contact information for architectural submissions. Some HOAs process applications through the board directly; others route everything through the management company. Knowing the correct submission address and contact person before you submit prevents delays from applications landing in the wrong inbox.
HOA Approval Adds 30 to 60 Days: How to Plan Around It
A typical residential solar installation in Temecula without HOA requirements moves from signed contract to Permission to Operate in roughly 8 to 14 weeks. That timeline includes system design, permit application and approval, installation, final city inspection, and SCE interconnection review.
With HOA approval in the sequence, the realistic total timeline is 12 to 20 weeks. The HOA step comes before the permit step in most cases because the city or county permit application often requires the HOA-approved design documents. If your HOA uses the full 45-day review window, that alone adds six to seven weeks to the front end of the process.
The best mitigation strategy is to start the HOA application at contract signing, not after your installer completes the permit-ready design. Many Temecula-area solar installers with HOA experience know how to prepare a preliminary design package sufficient for HOA submission while the full permit-ready design is being completed in parallel. This concurrent submission approach can compress the HOA-plus-permit phase by three to four weeks.
If your HOA meets monthly, find out when the architectural committee meets and target your submission so it lands before that meeting's cutoff date. Missing a monthly meeting by one day can add four weeks to your timeline if the committee only reviews applications at scheduled meetings.
Working with a Solar Company That Has HOA Experience in Temecula
The difference between a smooth HOA approval process and a protracted dispute often comes down to whether your installer has worked with your specific HOA before. An installer who has submitted to the Morgan Hill architectural committee six times knows what drawings that committee requires, what objections they commonly raise, and whether the committee prefers to receive applications via the management company portal or via certified mail.
When evaluating solar companies for a Temecula HOA property, ask the following questions directly:
- Have you submitted solar applications to [your specific HOA] before? If yes, how many, and what was the outcome?
- Do you prepare HOA-specific drawing packages as part of your standard process, or do I need to request this separately?
- Will you handle submitting the HOA application on my behalf, or is that my responsibility?
- If the HOA requests additional information during review, who handles the response and how quickly?
- What happens to my project timeline if the HOA uses the full 45-day review period?
- Have you had a HOA denial in Temecula in the last two years? If yes, how was it resolved?
An installer who can answer these questions with specifics, not generalities, has the experience to navigate your HOA approval without surprises. An installer who has never worked in your community and has no plan for the HOA process beyond "we submit the application" is likely to cause delays.
Local experience matters in Temecula specifically because the city's HOA landscape is dense and varied. Morgan Hill's architectural committee operates differently from Wolf Creek's. Harveston's guidelines have different specifics from Paloma del Sol's. The installer who has navigated multiple Temecula-area HOAs has a pattern-matching advantage that significantly reduces your risk of delays.
FAQ: HOA Solar Approval in California
Can a California HOA prohibit solar panels on my home?
No. Under California Civil Code Section 714, any HOA rule or CC&R provision that effectively prohibits a homeowner from installing a solar energy system on a roof or area they have exclusive use of is void and unenforceable. An HOA can impose reasonable aesthetic conditions, but it cannot issue a flat prohibition. Any written HOA denial citing blanket prohibitions is not legally enforceable under California state law.
How long does an HOA have to approve my solar application in California?
Under California Civil Code Section 714.1 as strengthened by AB 2188, an HOA must approve or deny a complete solar application within 45 days of receipt. If the HOA fails to act within that window, the application is deemed approved by operation of law. Submit your application via certified mail or email with read receipt so you can document the submission date and start the clock precisely.
What documents should I include in my HOA solar application?
A strong HOA solar application includes a signed cover letter citing Civil Code Section 714, a site plan or roof diagram showing panel placement with approximate dimensions, manufacturer specification sheets for the panels and inverter, conduit and wiring routing diagrams for any exterior-visible components, your installer's CSLB license number and proof of liability insurance, and a written statement of expected energy output. If the HOA has specific architectural guidelines for solar, address each one directly in your cover letter.
What restrictions can a California HOA legally impose on solar?
A California HOA can impose restrictions that qualify as reasonable under Civil Code Section 714, meaning they do not increase total installation cost by more than $1,000 and do not reduce the system's energy production by more than 10 percent. Legally permissible conditions include requiring panel placement on non-street-facing roof sections if technically feasible, specifying racking and conduit colors to match the home's exterior, requiring flush mounting, and mandating use of specific wire management covers.
What happens if my HOA denies my solar application?
Request the denial in writing. Review the reasons against Civil Code Section 714. If the denial cites a blanket prohibition or conditions that exceed the statutory limits, send a certified letter to the HOA board citing the code section and stating that the denial is void. California Civil Code Section 5900 requires HOAs to offer an internal dispute resolution process before formal legal action. Many HOAs reverse unlawful denials once they receive a written legal notice from an informed homeowner. If the HOA continues to deny, California law allows you to seek injunctive relief and recover attorney's fees.
Which Temecula HOAs have approved solar installations before?
Most of Temecula's major master-planned community HOAs have approved solar installations, including Morgan Hill, Wolf Creek, Harveston, Redhawk, Paloma del Sol, and Crowne Hill. Each has its own architectural committee and submission process. Having your installer confirm they have previously submitted to your specific HOA is valuable because they will already know the committee's preferences and typical review turnaround time.
Does adding HOA approval extend my solar installation timeline?
Yes. HOA approval adds roughly 30 to 45 days to the front end of your solar timeline. A typical Temecula installation without HOA requirements runs 8 to 14 weeks from contract to Permission to Operate. With HOA approval, plan for 12 to 20 weeks. Submitting the HOA application at contract signing, concurrently with the permit application where possible, is the most effective way to compress the total timeline.
The Bottom Line for Temecula HOA Homeowners
Living in a master-planned community in Temecula does not prevent you from going solar. California law is unambiguous: your HOA cannot prohibit solar, cannot delay approval beyond 45 days on a complete application, cannot add more than $1,000 to your project cost through its conditions, and cannot require placement that reduces your system output by more than 10 percent.
What the HOA process does require is preparation. Gathering your CC&Rs and architectural guidelines before contract signing, choosing an installer with documented HOA experience in Temecula, submitting a complete application with a cover letter that cites the statute, and starting the HOA submission at the same time as your permit application are the practical steps that separate a 30-day HOA approval from a months-long standoff.
If your HOA denies your application unlawfully, you have a clear legal path that most HOAs choose to avoid by reversing the denial when they receive a properly written notice. The law is on your side. The process just requires knowing how to use it.
Get a Solar Quote Built for Your HOA Community
We work with HOA homeowners across Temecula's master-planned communities every week. Tell us your community and we will connect you with an installer who has submitted to your specific HOA before.
Get Your HOA-Ready Solar Estimate